Aerial view of utility-scale solar farm engineered by ElectraGlobe

Renewable Energy Engineering

Power, Engineered to Last

End-to-end engineering for utility-scale solar, BESS, and hybrid energy systems. From concept design through commissioning, across Australia.

500+ MW Delivered
2.5+ GW Designed
50+ Years Combined Experience
16+ Projects

Project Portfolio

Delivering at Scale Across Australia & New Zealand

New Zealand Western Australia Northern Territory South Australia Queensland Tasmania Victoria Australian Capital Territory New South Wales New Zealand

Who We Are

Engineering Australia's Energy Transition

ElectraGlobe is a renewable energy engineering consultancy specialising in utility-scale solar farms, BESS installations, and hybrid energy systems. With over 50 years of collective experience and a portfolio spanning 2.5+ GW across Australia, we deliver end-to-end engineering from concept design through commissioning.

Our team brings deep expertise in AEMO GPS applications, grid connection studies, and power system modelling — the technical capabilities that matter most for large-scale energy project success.

End-to-End

Complete project lifecycle from feasibility through energisation.

Grid Expertise

Deep AEMO, DNSP, and NER compliance knowledge.

National Reach

Projects across NSW, VIC, QLD, WA, TAS, and New Zealand.

Standards Compliance

AS 3000, AS 1768, AS/NZS 7000, IEC 61850.

Latest Insights

Technical Perspectives on Renewable Energy

  • November 11, 2026
  • Renewable Energy

Protection Coordination for Embedded Generators: Reclosers, Desensitisation, NVD and Anti-Islanding

Putting a solar farm or battery on a distribution feeder changes what the feeder's protection sees. This article walks through a protection coordination study for an embedded generator: fault locations, desensitisation, grading, neutral voltage displacement and anti-islanding.

  • November 11, 2026
  • Renewable Energy

Protection Studies for Solar and BESS Connections in Australia: What NSPs Review

Before a solar farm or battery energises, the network wants proof that its protection will clear faults correctly and coordinate with theirs. This article explains what a protection study covers and what NSPs look for.

  • November 10, 2026
  • Renewable Energy

Taking a Grid-Forming BESS Through the GPS: Where the Access Standards Do Not Fit

Grid-forming batteries support the network in ways grid-following plant cannot, but the Generator Performance Standards were largely written around grid-following behaviour. This article explains where a grid-forming BESS fits awkwardly in the GPS, and how to study and negotiate those clauses.

Solar farm project

Contact Us

Ready to Power Your Next Project?

From concept to commissioning, our engineering team will guide your renewable energy project every step of the way.

Get our capability statement