We provide common electrical design elements including:
Single Line Diagrams: HV & LV
Protection & Metering Diagrams
Protection Reports
Earthing Reports and Studies: Substation & inverter station earthing design, solar PV field earthing design, lightning protection system design.
Cable Sizing: HV & LV, analysis based on installation and site conditions.
Cable Trench Design