This project, located in New South Wales, involves the development of a 4.85 MWAC solar farm. The installation features 11,544 photovoltaic (PV) modules and employs a single-axis tracking system to optimize energy capture by following the sun’s path throughout the day. The project is currently under commissioning.
Technical Specifications:
- PV Modules: 11,544
- Inverter: 1 Sungrow inverter
- Grid Connection: Connected at the distribution level to the AusNet network
- Project Capacity: 4.85 MWAC
- Tracking System: Single-axis
ElectraGlobe’s Scope of Work: ElectraGlobe was responsible for the detailed electrical design, ensuring compliance with all relevant standards and optimizing the project’s performance. Our scope included:
- Concept to IFC Package: Developing comprehensive design packages from initial concepts to Issue for Construction (IFC) documents
- Construction Support: Providing ongoing support during the construction phase to address any design-related issues and ensure seamless implementation
- Inverter: 1 Sungrow inverter
- Grid Connection: Connected at the transmission level to the AusNet network
- Project Capacity: 4.8 MWAC / 6.16 MWDC
- Tracking System: Single-axis
ElectraGlobe’s Scope of Work:
- Concept to IFC Package: Developing comprehensive design packages from initial concepts to Issue for Construction (IFC) documents
- Construction Support: Providing ongoing support during the construction phase to address any design-related issues and ensure seamless implementation
PV Modules
11,544
Inverter
1 Sungrow inverter
Grid Connection
Connected at the distribution level to the AusNet network
Project Capacity
4.85 MWAC
Tracking System
Single-axis