Aerial view of utility-scale solar farm engineered by ElectraGlobe

Renewable Energy Engineering

Power, Engineered to Last

End-to-end engineering for utility-scale solar, BESS, and hybrid energy systems. From concept design through commissioning, across Australia.

500+ MW Delivered
2.5+ GW Designed
50+ Years Combined Experience
16+ Projects

Project Portfolio

Delivering at Scale Across Australia & New Zealand

New Zealand Western Australia Northern Territory South Australia Queensland Tasmania Victoria Australian Capital Territory New South Wales New Zealand

Who We Are

Engineering Australia's Energy Transition

ElectraGlobe is a renewable energy engineering consultancy specialising in utility-scale solar farms, BESS installations, and hybrid energy systems. With over 50 years of collective experience and a portfolio spanning 2.5+ GW across Australia, we deliver end-to-end engineering from concept design through commissioning.

Our team brings deep expertise in AEMO GPS applications, grid connection studies, and power system modelling — the technical capabilities that matter most for large-scale energy project success.

End-to-End

Complete project lifecycle from feasibility through energisation.

Grid Expertise

Deep AEMO, DNSP, and NER compliance knowledge.

National Reach

Projects across NSW, VIC, QLD, WA, TAS, and New Zealand.

Standards Compliance

AS 3000, AS 1768, AS/NZS 7000, IEC 61850.

Latest Insights

Technical Perspectives on Renewable Energy

  • November 18, 2026
  • Renewable Energy

Fault Ride-Through Under S5.2.5.5 and S5.2.5.5A: Reactive Current Injection Explained

Fault ride-through is the clause most inverter-based plants end up negotiating. Since the 2025 access standards rule it is split in two: S5.2.5.5 says which disturbances the plant must survive, and S5.2.5.5A says how it must respond. This is how both are studied and argued.

  • November 18, 2026
  • Renewable Energy

Multiple Fault Ride-Through (MFRT): Fifteen Faults in Five Minutes

The NER requires generating systems to ride through a series of up to fifteen disturbances in five minutes. This article explains the clause, how MFRT sequences are built and simulated, what limits the plant, and what reviewers look for.

  • November 17, 2026
  • Renewable Energy

Harmonic Studies and Filter Design for Transmission-Connected Solar and BESS

Large inverter plants on capacitive or weak transmission networks often exceed their harmonic allocation without filters. This article explains how a transmission harmonic study is built, how amplification is assessed, and how to design filters that survive detailed design.

Solar farm project

Contact Us

Ready to Power Your Next Project?

From concept to commissioning, our engineering team will guide your renewable energy project every step of the way.

Get our capability statement