Project Portfolio

Engineering Solar, BESS and Hybrid Projects Across Australia & New Zealand

From 5 MW distribution-connected solar farms to 400 MW-plus transmission-scale batteries. Each card shows our scope on the project.

projects
16
combined capacity
2,493 MW
of storage
9,530 MWh
states and countries
6

NSW · VIC · QLD · WA · TAS · New Zealand

BESS Narrandera Shire, New South Wales, Australia

Strontian BESS

430 MW / 1,720 MWh BESS

Our scope: Concept design.

BESS Victoria, Australia

Kerang BESS Phase 2

400 MW / 1,600 MWh BESS

Our scope: 15% design package.

BESS Queensland, Australia

Gelston Energy Park

400 MW / 1,600 MWh BESS

Our scope: Concept design package.

BESS Western Australia

Neerabup Energy Park

300 MW / 1,800 MWh BESS

Our scope: Concept design.

Hybrid Energy Park Western Australia

Three Springs Energy Park

100 MW (AC) Solar PV + 200 MW / 1,200 MWh BESS

Our scope: Electrical concept design.

BESS Victoria, Australia

Kerang BESS Phase 1

300 MW / 1,200 MWh BESS

Our scope: 15% design package.

Hybrid New South Wales, Australia

Gregadoo Hybrid Farm

100 MW Solar PV + 200 MW / 400 MWh BESS

Our scope: Concept design package.

Utility-Scale Solar Victoria, Australia

26.4MW Solar Farm Project in Victoria

26.4 MW

Our scope: Concept design, detailed engineering, grid connection studies and commissioning support.

Solar Farm Victoria, Australia

6.12MW Solar Farm Project in Victoria

6.12 MW

Our scope: End-to-end engineering, from feasibility through to commissioning.

Solar Farm Victoria, Australia

6MW Solar Farm Project in Victoria

6 MW

Our scope: Solar farm engineering delivered to Victorian DNSP requirements.

Solar Farm New South Wales, Australia

Boorowa Solar Farm

5 MW (AC) / 6.5 MWp (DC)

Our scope: MV design and power system studies, including earthing, protection coordination, and medium voltage cable sizing.

Solar Farm New South Wales, Australia

Geurie Solar Farm

5 MW (AC) / 6.5 MWp (DC)

Our scope: MV design and power system studies, including earthing, protection coordination, and medium voltage cable sizing.

Solar Farm New South Wales, Australia

4.85 MW Solar Farm Project in New South Wales

4.85 MW

Our scope: Electrical design, grid connection applications and compliance documentation through to DNSP approval.

BESS Tasmania, Australia

Hobart Showground BESS

10 MW / 10 MWh

Our scope: BESS design, system integration and grid compliance engineering for a one-hour battery at the Hobart Showground.

Solar Farm Victoria, Australia

Maryvale Solar Farm

Our scope: CCTV system design.

SCADA Compliance New Zealand

Tauhei Solar Farm

Our scope: SCADA compliance assessment.

Ready to Discuss Your Project?

From concept to commissioning — let's engineer your next energy project.