Providing in-depth grid connection studies compliant with regulatory standards:
NEM-Wide Planning Studies
Event Investigation Studies
Generator Performance Assessments
PSSE/PSCAD Benchmarking
OEM Model Tuning and NER Compliance Testing
R1 and R2 Registration and Testing Packages: Power system and detailed design elements, commissioning management, hold point test simulations, troubleshooting, validation, and GPS compliance testing