Navigating the Australian Energy Market Operator (AEMO) requirements:
Generation Performance Standards (GPS) Applications
Compliance with Chapter 5 and 5A of the National Electricity Rules (NER)
Dynamic Model Acceptance Tests (DMAT)
GPS Compliance Testing
Negotiation and Approval: Obtaining AEMO’s approval under NER 5.3.10
Technical Assessments: Assessing altered system performance against registered performance standards
Updating GPS: Registering updates with AEMO
Metering Requirements: Identifying requirements to support alternative BESS operating philosophies
Connection Point Review: Suitability assessment for alternative BESS operating philosophies
Runback or Curtailment Scenarios: Identifying possible scenarios with proposed configurations