Ensuring seamless integration of renewable energy projects with the grid:
Grid Connection Application Package: Guiding you through all steps, including preliminary feasibility studies, detailed connection enquiry, offer to connect, grid connection agreement, and dynamic model acceptance test (DMAT)
Python Scripting and Automation: Handling large data and multiple scenarios as required by network service providers (NSPs)
New South Wales (NSW):
- Ausgrid
- Essential Energy
- Endeavour Energy
Australian Capital Territory (ACT):
- Evoenergy
Victoria (VIC):
- Powercor
- CitiPower
- United Energy
- AusNet Services
- Jemena
Tasmania (TAS):
- TasNetworks
South Australia (SA):
- SA Power Networks
Western Australia (WA):
- Horizon Power
- Western Power
Queensland (QLD):
- Ergon Energy
- Energex
Supply Network Protection Units: Providing network protection units (NPUs) in accordance with AS4777.2 and DNSP settings.
Witness Testing and Injection Testing: Conducting thorough witness testing and injection testing to ensure compliance and performance.