We provide comprehensive design elements for utility-scale renewable projects, including:
Site Plans and General Arrangement: Incorporating access roads, HV/MV substations, and associated facilities.
Substation and Building Layouts
Electrical Design: DC, LV, and HV
Civil-Electrical Design
Structural and Civil Engineering
Full Design Packages: From concept to Issue For Construction (IFC) documents
Earthing Design: Ensuring safety and compliance with AS 3000 and AS 1768
Protection Coordination Reports: Analysis and reporting according to AS/NZS 7000 and IEC 61850