Get in Touch with ElectraGlobe.
Stainless Steel
Steel Factory
Tool Steel
Protection Steel
We will help you find you steel solution
We are the leading global stockholder and
supplier of pipes, fittings & flanges.
Trusted by forward-thinking construction & engineering teams around the world
50+ years of collective experience in the renewable energy sector.
Address
Office Hours
Got some questions? The following are frequently asked questions we get asked about.
Feel free to use the contact form on our website to send us a message. We aim to respond to all inquiries within one business day.
1. What services does ElectraGlobe offer?
We offer comprehensive renewable energy engineering consultancy services, including grid connection studies, solar farm design, BESS (Battery Energy Storage Systems) solutions, and substation design.
2. How can I start a project with ElectraGlobe?
You can reach out to us via our contact form, email, or phone. Our team will guide you through the initial consultation and project planning stages.
3. What areas do you serve?
We serve clients across Australia, including Victoria, New South Wales, Queensland, and South Australia.
4. What is included in the Grid Connection Application Package?
Our package includes preliminary feasibility studies, detailed connection enquiry, offer to connect, grid connection agreement, and dynamic model acceptance test (DMAT).
5. What experience do you have with DNSPs and TNSPs?
We have extensive experience working with major DNSPs in Australia, including Ausgrid, Essential Energy, Endeavour Energy, Powercor, CitiPower, United Energy, AusNet Services, TasNetworks, SA Power Networks, and Energex. We also collaborate with TNSPs such as AEMO, TransGrid, Powerlink, and ElectraNet.
6. What power system studies do you offer?
We offer a range of power system studies, including load flow analysis, fault level calculations, stability analysis, and harmonic studies, ensuring optimal performance and compliance with industry standards.
7. What owner’s engineer services do you provide?
As an owner’s engineer, we provide project management, technical advisory, and quality assurance services throughout the project lifecycle, ensuring your project meets all regulatory and performance requirements.