Project Overview: Located in the heart of Victoria, this ambitious solar project delivers 4.8 MWAC of clean, renewable energy. With a total DC capacity of 6.16 MW, the project harnesses the power of 11,172 state-of-the-art photovoltaic (PV) modules. These modules, supported by a single-axis tracking system, dynamically follow the sun’s trajectory, maximizing energy capture throughout the day. The project is now fully constructed and is currently undergoing commissioning.
Technical Specifications:
- PV Modules: 11,172 (7,638 LONGI LR5-72HBD-550M and 3,534 LONGI LR5-72HBD-555M)
- Inverters: 2 SMA MVPS 2475-S2
- Grid Connection: Connected at the distribution level to the AusNet 22 kV network
- Project Capacity: 4.8 MWAC / 6.16 MWDC
- Tracking System: Single-axis
- Project Area: 15.8 hectares
ElectraGlobe’s Scope of Work: ElectraGlobe’s involvement ensures the project’s success through meticulous planning and design. Our comprehensive scope includes:
- Concept to IFC Package: Crafting detailed design packages from initial concepts to Issue for Construction (IFC) documents.
- Construction Support: Offering continuous support during the construction phase to address design-related challenges and ensure smooth execution.
PV Modules
11,172 (7,638 LONGI LR5-72HBD-550M and 3,534 LONGI LR5-72HBD-555M)
Inverters
2 SMA MVPS 2475-S2
Grid Connection
Connected at the distribution level to the AusNet 22 kV network
Project Capacity
4.8 MWAC / 6.16 MWDC
Tracking System
Single-axis
Project Area
15.8 hectares