Our Projects

Project Portfolio

Delivering Renewable Energy Across Australia & Asia Pacific

Solar farms, BESS, hybrid installations, and SCADA compliance across multiple states.

BESS Narrandera Shire, New South Wales, Australia
430 MW / 1,720 MWh BESS

Concept design.

BESS Victoria, Australia
400 MW / 1,600 MWh BESS

15% design package.

BESS Queensland, Australia
400 MW / 1,600 MWh BESS

Concept design package.

BESS Western Australia
300 MW / 1,800 MWh BESS

Concept design.

Hybrid Energy Park Western Australia
100 MW (AC) Solar PV + 200 MW / 1,200 MWh BESS

Electrical concept design.

BESS Victoria, Australia
300 MW / 1,200 MWh BESS

15% design package.

Hybrid New South Wales, Australia
100 MW Solar PV + 200 MW / 400 MWh BESS

Concept design package.

Utility-Scale Solar Victoria, Australia
26.4 MW

A large-scale solar installation demonstrating ElectraGlobe's capacity to deliver utility-scale renewable energy projects. Our scope included concept design, detailed engineering, grid connection studies, and commissioning support.

Solar Farm Victoria, Australia
6.12 MW

A mid-scale solar farm project showcasing efficient design and reliable grid integration. ElectraGlobe provided end-to-end engineering services from feasibility through to commissioning.

Solar Farm Victoria, Australia
6 MW

Another successful solar farm delivery in Victoria, reinforcing ElectraGlobe's deep understanding of DNSP requirements and local grid conditions.

Solar Farm New South Wales, Australia
5 MW (AC) / 6.5 MWp (DC)

MV design and power system studies, including earthing, protection coordination, and medium voltage cable sizing.

Solar Farm New South Wales, Australia
5 MW (AC) / 6.5 MWp (DC)

MV design and power system studies, including earthing, protection coordination, and medium voltage cable sizing.

Solar Farm New South Wales, Australia
4.85 MW

A solar farm project in NSW where ElectraGlobe managed the electrical design, grid connection applications, and compliance documentation for seamless DNSP approval.

BESS Tasmania, Australia
10 MW / 10 MWh

10 MW / 10 MWh (1-hour duration) battery energy storage system at the Hobart Showground in Tasmania, delivering BESS design, system integration, and grid compliance engineering.

Solar Farm Victoria, Australia
TBD

CCTV system design.

SCADA Compliance New Zealand
TBD

SCADA compliance assessment.

Ready to Discuss Your Project?

From concept to commissioning — let's engineer your next energy project.