Steady-State and Dynamic Studies

Steady-State and Dynamic Studies

We provide in-depth grid connection studies compliant with regulatory standards, offering comprehensive power system modelling for generators to ensure NEM compliance and optimal performance.

What We Deliver

  • NEM-Wide Planning Studies
  • Event Investigation Studies
  • Generator Performance Assessments
  • PSSE/PSCAD Benchmarking
  • OEM Model Tuning and NER Compliance Testing
  • R1 and R2 Registration and Testing Packages: Power system and detailed design elements, commissioning management, hold point test simulations, troubleshooting, validation, and GPS compliance testing

Power System Modelling

Our team conducts comprehensive power system studies using PSS/E and PSCAD to analyse load flow, transient stability, fault ride-through, and voltage regulation. These studies ensure your generator meets all NEM requirements.

Registration and Testing

We provide complete R1 and R2 registration and testing packages, managing all aspects from power system modelling through commissioning management, hold point test simulations, and GPS compliance testing.