DNSP Grid Connection Studies and NPU Supply

Ensuring seamless integration of renewable energy projects with the grid:

Grid Connection Application Package: Guiding you through all steps, including preliminary feasibility studies, detailed connection enquiry, offer to connect, grid connection agreement, and dynamic model acceptance test (DMAT)
Python Scripting and Automation: Handling large data and multiple scenarios as required by network service providers (NSPs)

New South Wales (NSW):

  • Ausgrid
  • Essential Energy
  • Endeavour Energy

Australian Capital Territory (ACT):

  • Evoenergy

Victoria (VIC):

  • Powercor
  • CitiPower
  • United Energy
  • AusNet Services
  • Jemena

Tasmania (TAS):

  • TasNetworks

South Australia (SA):

  • SA Power Networks

Western Australia (WA):

  • Horizon Power
  • Western Power

Queensland (QLD):

  • Ergon Energy
  • Energex
Supply Network Protection Units: Providing network protection units (NPUs) in accordance with AS4777.2 and DNSP settings.
Witness Testing and Injection Testing: Conducting thorough witness testing and injection testing to ensure compliance and performance.