Streamlining AEMO GPS Applications: Common Pitfalls and How to Avoid Them

The Generator Performance Standards (GPS) are important for renewable energy assets in the National Electricity Market (NEM). The Australian Energy Market Operator (AEMO) sets these guidelines to govern grid connection and operational performance for generators such as solar farms and battery systems. They define site management technicalities that generators should

Read More
Verification of PV tracker earthing connection during commissioning using a Megger MOM2 micro-ohmmeter

Commissioning a 5MW Solar Farm: From CMP to DNSP Approval

Commissioning a 5 MW solar farm is the final step that transitions a project from construction into a safe, grid-connected operation. For distribution-connected solar farms, the commissioning process is governed by the Distribution Network Service Provider (DNSP). As such, electrical contractors in Sydney should follow strict technical and compliance requirements.

Read More
Two men in safety vests talking in the middle of a solar farm

Overcoming Challenges in the Solar Farm Development Approval (DA) Process

Australia’s renewable energy sector is booming, with solar farms at the forefront. However, before construction begins, every project must secure Development Approval (DA). This important step requires careful planning, technical accuracy, and strong communication with local authorities. To avoid costly delays, many solar developers partner with experienced electrical engineering companies.

Read More
  • 1
  • 2