Additional Services

Additional Services

Large-scale solar and BESS projects require a comprehensive set of technical documents beyond the core engineering deliverables.

Documentation Beyond the Core Design

  • Basis of design report
  • Procurement specifications
  • Wiring diagrams

ElectraGlobe produces the full suite of documentation that keeps your project moving.

What ElectraGlobe Delivers

Design Reports
Basis of Design (BoD) Report
Earthing Study and Lightning Risk Assessment Report
Protection Coordination Study Report
PVsyst energy yield report and string configuration analysis
Cable Schedules
DC string cable schedules
AC LV cable schedules
AC HV cable schedules
CAT6 communication cable schedules
Fibre optic communication cable schedules
Earthing conductor schedules
Equipment Datasheets
DC string and sub-array cable datasheets
LV AC and MV AC cable datasheets
Earth grid conductor datasheets
CAT6 datasheets
Fibre optic datasheets
Weather station datasheets
Procurement Specifications
DC combiner box procurement specification
General and communication cable procurement specifications
Weather station procurement specification
Site Layout Plans
Overall site layout and general arrangement
AC reticulation layout
Protection and metering arrangement
Earthing block plan and general arrangement
Wiring Details and Diagrams
DC string wiring details and module stringing diagrams
Trench cross-section and cable separation details
DC string single-line diagrams
General Arrangements and Elevations
Power conversion unit (PCU / combiner station) general arrangements
Tracker row and module mounting elevations
Optical fibre layout plans
LV AC distribution layout

Complete Documentation Packages

Our documentation services provide every technical deliverable required for project development, procurement, and construction. From basis of design reports through to detailed wiring diagrams, we ensure nothing is missed.

Procurement Support

We prepare detailed procurement specifications and datasheets that enable efficient and accurate equipment sourcing, reducing procurement risks and ensuring compatibility across all project components.

Why These Documents Matter

These deliverables are essential. Procurement without accurate specifications leads to incompatible equipment. Construction without complete wiring diagrams creates errors that are expensive to fix on site. Lenders and investors reviewing project documents expect a complete and coherent technical package.

ElectraGlobe's additional services ensure nothing is missing when it matters most.