ElectraGlobe helps hyperscale and enterprise data centre operators build the power infrastructure that keeps facilities online: connecting to the grid, integrating renewable generation and storage, and navigating the compliance framework AEMO and network operators apply to high-demand, inverter-based loads.
We manage the full scope of a data centre power project, from feasibility and concept design through grid connection, AEMO large-load registration and construction-ready detailed engineering, giving developers and operators a single engineering partner across the entire connection and renewable integration process.
Data centre power infrastructure engineering covers the technical work required to connect a large-load facility to the grid, secure its supply, and meet Australia's emerging renewable energy and compliance obligations for data centres.
Getting the engineering right determines whether a facility connects on schedule, meets its sustainability commitments, and avoids costly curtailment or compliance risk.
| Scope | What we deliver |
|---|---|
| Feasibility | Connection point pre-assessment for large loads, capacity screening and constraints analysis |
| Connection applications | DNSP and TNSP applications, technical responses and negotiation through to connection agreement |
| AEMO registration | Large load registration support and compliance evidence |
| Access standards | Compliance for inverter-based and power-electronic loads |
| Power quality | Power quality, harmonic and fault level studies |
| Power system studies | Load flow, fault ride-through and dynamic stability studies in PSS/E and PSCAD |
| Scope | What we deliver |
|---|---|
| Co-located generation | Solar PV and BESS design for renewable offset and firming |
| PPA support | Power purchase agreement technical due diligence and structuring support |
| Backup power | On-site backup generation and UPS integration |
| Behind the meter | Behind-the-meter system design and demand management strategy |
| Microgrids | Microgrid and hybrid renewable-plus-storage configurations |
| High voltage | Substation, switchyard and HV/MV electrical design |
We take on the full scope or step in at a single phase, depending on what your internal team already covers.
We partner with hyperscale and colocation data centre operators, developers, infrastructure investors and EPC contractors who need a trusted engineering partner to navigate Australia's evolving data centre power and renewable energy compliance landscape.
If you have a site under assessment or a connection enquiry already lodged, we can tell you quickly where the real risks sit.