Tell us the project, its size and where it connects, and an engineer will come back to you.
Get in Touch Get our capability statementGrid Connection Studies
Getting a renewable energy project connected to the Australian grid is one of the most technically demanding and commercially critical phases of project development. ElectraGlobe manages the full grid connection process, handling the technical complexity on your behalf and keeping your connection timeline on track.
Our grid connection services cover the full application process with all distribution and transmission network service providers across Australia, from preliminary feasibility through to Dynamic Model Acceptance Testing.
What Are Grid Connection Studies?
Grid connection studies are the technical analyses required to assess how a new generator or storage system will interact with the existing electricity network at the proposed connection point.
The Core Studies
- Power flow analysis: steady-state voltages, thermal loading and power transfer at the connection point
- Fault level assessment: short circuit contribution and equipment fault rating adequacy
- Protection coordination: grading, settings and network protection unit configuration
- Dynamic stability: system response to faults, disturbances and network events
- Voltage regulation: voltage rise, step change and reactive power capability
These studies form the technical basis of your connection enquiry and must satisfy the requirements of the relevant network service provider before an offer to connect is issued.
What ElectraGlobe Delivers
Our scope is set by the stage your project is at and by how much of the connection work your internal team already covers.
| Connection Process Management | What we deliver |
|---|---|
| Feasibility | Preliminary feasibility assessment and connection point pre-screening |
| Enquiry | Detailed connection enquiry preparation and submission |
| NSP review | Technical response management while the NSP assesses the application |
| Offer to connect | Offer review and negotiation support |
| Agreement | Grid connection agreement execution support |
| Model acceptance | Dynamic Model Acceptance Testing (DMAT) |
| Technical Studies | What we deliver |
|---|---|
| Load flow | Load flow and power transfer analysis |
| Fault level | Fault level and short circuit analysis |
| Protection | Protection coordination and network protection unit settings |
| Automation | Python scripting and automation for large data sets and multiple NSP scenarios |
| Commissioning | Witness testing and injection testing for protection relay commissioning |
| Standards and Compliance | What we deliver |
|---|---|
| AS 4777.2 | Compliant protection settings for inverter-based generators |
| DNSP requirements | Technical requirements met for all Australian states |
| TNSP requirements | Connection requirements for large-scale generators |
Network Service Providers We Work With
We have established working relationships with all major NSPs across Australia.
| State | Network service providers |
|---|---|
| NSW | Ausgrid, Essential Energy, Endeavour Energy |
| VIC | Powercor, CitiPower, United Energy, AusNet Services, Jemena |
| QLD | Ergon Energy, Energex |
| SA | SA Power Networks |
| TAS | TasNetworks |
| WA | Horizon Power, Western Power |
| ACT | Evoenergy |
Each provider sets its own technical requirements, submission formats and review timelines, and knowing them before the enquiry is lodged is what keeps a connection on programme.
Frequently Asked Questions
What is a grid connection study?
A grid connection study shows how a proposed generator or battery will behave on the network at its connection point: how it affects voltages and thermal loading, how much fault current it adds, how its protection coordinates with the network and how it rides through faults and disturbances. The network service provider relies on these studies before it will make an offer to connect.
How long does a grid connection take in Australia?
It depends heavily on the network, the connection point and the size of the project. Transmission connections that need AEMO's involvement and full dynamic studies take considerably longer than small distribution connections. Starting the studies early and lodging a complete, well-supported application is the most reliable way to shorten the timeline.
Do you handle both DNSP and TNSP connections?
Yes. We prepare and manage applications with distribution and transmission network service providers in every state, including the AEMO GPS process for projects that need it.
What documents does a connection application need?
That varies by provider and project size, but typically includes single-line diagrams, equipment data, protection settings, power system models and the study reports themselves. Our guide below lists what a DNSP usually asks for.
Related Guides
- Solar farm grid connection process in Australia
- DNSP grid connection application: documents checklist
- Steady-state vs dynamic studies for solar grid connection
- PSS/E and PSCAD modelling for AEMO
- MLF and curtailment risk for renewable projects
- AEMO GPS applications: common pitfalls to avoid
If you have a site under assessment or an enquiry already with an NSP, we can tell you quickly where the technical risk sits and what the connection path looks like.