Tell us the project, its size and where it connects, and an engineer will come back to you.
Get in Touch Get our capability statementUtility-Scale Solar Farm Design
ElectraGlobe provides solar farm design and end-to-end engineering for utility-scale solar farms and battery energy storage systems across Australia and New Zealand. We work with developers, asset owners and EPC contractors, managing every phase from feasibility and concept design through detailed engineering to grid connection and commercial operation.
Our engineers work across the NEM's technical and regulatory requirements every day, which is what gives a project its best chance of connecting on time and on budget.
What Is Utility-Scale Solar Farm Engineering?
Utility-scale solar farm engineering covers everything technical required to develop, design, connect and build a large-scale solar or hybrid project.
The difference from commercial installations is not just size. A utility-scale project has to satisfy AEMO and DNSP/TNSP requirements that a rooftop system never encounters.
Requirements Every Utility-Scale Project Must Meet
- Generator Performance Standards: negotiated and registered with AEMO
- Network protection settings: coordinated with the connecting network
- Dynamic modelling: PSS/E and PSCAD models that survive review
- IFC documentation: complete packages a contractor can build from
Getting these right is usually what separates a project that energises on schedule from one that spends a year in the connection queue.
What We Offer
| Project phase | What we deliver |
|---|---|
| Feasibility and site assessment | Site screening, constraints analysis, indicative yield and grid connection pre-assessment |
| Concept and detailed design | DC, LV, MV and HV systems from concept through to IFC, including layout optimisation and PVsyst energy yield modelling |
| Grid connection | DNSP and TNSP applications, technical responses and negotiation through to connection agreement |
| AEMO GPS | Generator Performance Standards negotiation, dynamic modelling and compliance testing |
| Power system studies | Steady-state, dynamic and power quality analysis |
| Substation and switchyard | Primary and secondary design, protection and control |
| Construction and commissioning | Site engineering support, hold points, testing and energisation |
| Owner's engineering | Design review, technical due diligence and independent assurance |
We take on the full scope or step in at a single phase, depending on what your internal team already covers.
Solar Farms and Battery Storage
Most of our work falls into three shapes, and each carries a different engineering risk.
| Asset type | Typical scale | Where the engineering effort concentrates |
|---|---|---|
| Utility-scale solar | 5 MW to 100+ MW | Layout optimisation, tracker versus fixed-tilt trade-offs, PVsyst yield modelling and string configuration |
| Standalone BESS | Grid-scale, front-of-meter | System sizing and dispatch strategy, thermal management, protection coordination and GPS registration |
| Hybrid solar + BESS | Co-located, up to 430 MW | Shared connection point design, control philosophy and GPS compliance across both assets |
Co-located projects are where most connection programmes slip. Two generating systems behind one connection point means one set of performance standards covering both, and the modelling has to hold up under that.
Why Choose ElectraGlobe for Utility-Scale Projects?
What Sets Our Team Apart
- Integrated team: engineering, grid connection and AEMO GPS under one roof, so nothing falls between consultants
- Proven delivery: solar farms and BESS projects taken from feasibility through to energisation
- Jurisdictional depth: familiarity with AEMO, DNSP and TNSP requirements in every state
- Buildable documentation: IFC packages that meet what construction contractors actually expect
- Engagement that fits: full scope, single phase or owner's engineer, depending on your internal capability
Frequently Asked Questions
What counts as a utility-scale solar farm?
We use the term for solar, battery and hybrid projects above 5 MW that connect to a distribution or transmission network. In the NEM, generating systems of 5 MW and above generally have to be registered with AEMO or granted an exemption, which is where Generator Performance Standards, dynamic models and network protection requirements start to apply.
How long does a utility-scale solar farm take to develop?
Several years from site selection to commercial operation is normal. Construction is usually the shorter part. Land, development approval and above all the grid connection set the critical path, which is why we start grid and GPS work during feasibility rather than after design.
Do you design BESS and hybrid projects as well as solar?
Yes. Standalone grid-scale batteries and co-located solar plus storage are a large share of our work. Hybrids need particular care because both assets share one connection point and one set of performance standards.
Can you take over a project that is already in progress?
Yes. We regularly step in at a single phase, for example to finish a stalled connection application, review a contractor's detailed design or support commissioning.
Related Guides
- How to build a utility-scale solar farm in Australia
- Solar farm electrical design: SLD to cable schedules
- What's in an IFC design package for a solar farm
- Hybrid solar and BESS projects in Australia
- BESS project development: phases and timelines
- AEMO Generator Performance Standards explained
Who We Work With
We partner with renewable energy developers, infrastructure investors, EPC contractors and asset owners who need an engineering partner with the technical depth to carry a complex utility-scale project from start to finish.
If you have a project at any stage, from a site under option to a connection application already in review, we can tell you quickly where the real risks sit.