Commercial & Industrial

ElectraGlobe engineers commercial and industrial solar PV and battery energy storage systems for businesses that want to take control of their energy spend. We design systems that work with your load profile, infrastructure and grid connection, maximising self-consumption, reducing peak demand charges and delivering measurable return on investment.

We work with commercial property owners, industrial operators, energy retailers and EPC contractors, taking on the full scope or stepping in at a single phase.

What Is Commercial and Industrial Solar Engineering?

Commercial and industrial solar engineering goes beyond panel selection and inverter sizing. For C&I facilities, the design must account for:

What the Design Has to Account For

  • Existing electrical infrastructure: switchboard capacity, spare ways and available fault level
  • Network tariff structures: demand charges, time-of-use periods and export arrangements
  • Load profiles: when the site actually consumes, not just how much
  • Grid connection limitations: export limits and DNSP hosting capacity at the connection point
  • DNSP technical standards: compliance built into the design, not retrofitted at approval

A well-engineered C&I system integrates seamlessly with your site and delivers consistent performance over its 25-year design life.

What ElectraGlobe Delivers

Commercial SolarIndustrial Solar & Storage
Rooftop and ground-mount solar PV design for warehouses, office buildings and shopping centresSolar PV design for high-demand industrial facilities
System sizing based on detailed load analysis and energy yield modellingBehind-the-meter battery storage for peak demand reduction
String and inverter configuration for maximum performancePower factor correction design and integration
Grid connection applications and DNSP approval managementEmbedded network design for multi-tenancy sites
Electrical design and compliance documentationDemand management strategy and load shifting analysis
ROI and payback analysisFull electrical design and IFC documentation

Most C&I projects that disappoint do so on the tariff side rather than the technical side: a system sized on annual consumption instead of the site's demand profile can generate what was promised and still barely move the bill.

Why Choose ElectraGlobe for Commercial and Industrial Projects?

What Sets Our Team Apart

  • Lower energy bills through maximised self-consumption and demand management
  • Improved power quality and reduced peak demand charges
  • Sustainability targets met, with Scope 2 emissions reduced
  • Designs built around your load profile and network tariff structure
  • Full documentation for DNSP approval and construction handover

Who We Work With

We work with commercial property owners, industrial operators, energy retailers, and EPC contractors looking for reliable, technically rigorous C&I solar engineering across Australia.

If you have a site in mind, send us twelve months of interval data and we can tell you quickly whether the numbers work.