All Services
Utility-Scale Solar Farm Design Commercial & Industrial Concept Design Detailed Engineering Owner's Engineering Services Grid Connection Studies AEMO GPS Applications Power System Studies Power Quality Analysis Additional Services Construction Management Data Centre Grid ConnectionNeed This Service?
Tell us the project, its size and where it connects, and an engineer will come back to you.
Get in Touch Get our capability statementAdditional Services
Large-scale solar and BESS projects require a comprehensive set of technical documents beyond the core engineering deliverables.
Documentation Beyond the Core Design
- Basis of design report
- Procurement specifications
- Wiring diagrams
ElectraGlobe produces the full suite of documentation that keeps your project moving.
What ElectraGlobe Delivers
| Design Reports |
|---|
| Basis of Design (BoD) Report |
| Earthing Study and Lightning Risk Assessment Report |
| Protection Coordination Study Report |
| PVsyst energy yield report and string configuration analysis |
| Cable Schedules |
|---|
| DC string cable schedules |
| AC LV cable schedules |
| AC HV cable schedules |
| CAT6 communication cable schedules |
| Fibre optic communication cable schedules |
| Earthing conductor schedules |
| Equipment Datasheets |
|---|
| DC string and sub-array cable datasheets |
| LV AC and MV AC cable datasheets |
| Earth grid conductor datasheets |
| CAT6 datasheets |
| Fibre optic datasheets |
| Weather station datasheets |
| Procurement Specifications |
|---|
| DC combiner box procurement specification |
| General and communication cable procurement specifications |
| Weather station procurement specification |
| Site Layout Plans |
|---|
| Overall site layout and general arrangement |
| AC reticulation layout |
| Protection and metering arrangement |
| Earthing block plan and general arrangement |
| Wiring Details and Diagrams |
|---|
| DC string wiring details and module stringing diagrams |
| Trench cross-section and cable separation details |
| DC string single-line diagrams |
| General Arrangements and Elevations |
|---|
| Power conversion unit (PCU / combiner station) general arrangements |
| Tracker row and module mounting elevations |
| Optical fibre layout plans |
| LV AC distribution layout |
Complete Documentation Packages
Our documentation services provide every technical deliverable required for project development, procurement, and construction. From basis of design reports through to detailed wiring diagrams, we ensure nothing is missed.
Procurement Support
We prepare detailed procurement specifications and datasheets that enable efficient and accurate equipment sourcing, reducing procurement risks and ensuring compatibility across all project components.
Why These Documents Matter
These deliverables are essential. Procurement without accurate specifications leads to incompatible equipment. Construction without complete wiring diagrams creates errors that are expensive to fix on site. Lenders and investors reviewing project documents expect a complete and coherent technical package.
ElectraGlobe's additional services ensure nothing is missing when it matters most.