Utility-Scale Solar Farms

Solar Farm Projects

Solar farm engineering from 5 MW to 26+ MW — concept design, detailed engineering, grid connection, and commissioning.

projects
8
combined capacity
53 MW
states and countries
3

NSW · VIC · New Zealand

Utility-Scale Solar Victoria, Australia

26.4MW Solar Farm Project in Victoria

26.4 MW

Our scope: Concept design, detailed engineering, grid connection studies and commissioning support.

Solar Farm Victoria, Australia

6.12MW Solar Farm Project in Victoria

6.12 MW

Our scope: End-to-end engineering, from feasibility through to commissioning.

Solar Farm Victoria, Australia

6MW Solar Farm Project in Victoria

6 MW

Our scope: Solar farm engineering delivered to Victorian DNSP requirements.

Solar Farm New South Wales, Australia

Boorowa Solar Farm

5 MW (AC) / 6.5 MWp (DC)

Our scope: MV design and power system studies, including earthing, protection coordination, and medium voltage cable sizing.

Solar Farm New South Wales, Australia

Geurie Solar Farm

5 MW (AC) / 6.5 MWp (DC)

Our scope: MV design and power system studies, including earthing, protection coordination, and medium voltage cable sizing.

Solar Farm New South Wales, Australia

4.85 MW Solar Farm Project in New South Wales

4.85 MW

Our scope: Electrical design, grid connection applications and compliance documentation through to DNSP approval.

Solar Farm Victoria, Australia

Maryvale Solar Farm

Our scope: CCTV system design.

SCADA Compliance New Zealand

Tauhei Solar Farm

Our scope: SCADA compliance assessment.

Planning a Similar Project?

Talk to the engineers who did this work, or see the bess projects and hybrid projects.