BESS
Narrandera Shire, New South Wales, Australia
Strontian BESS
430 MW / 1,720 MWh BESS
Our scope: Concept design.
Battery Energy Storage Systems
Grid-scale battery energy storage projects across Australia, from concept design and 15% design packages to system integration and grid compliance.
NSW · VIC · QLD · WA · TAS
Our scope: Concept design.
Our scope: 15% design package.
Our scope: Concept design package.
Our scope: Concept design.
Our scope: 15% design package.
Our scope: BESS design, system integration and grid compliance engineering for a one-hour battery at the Hobart Showground.
Talk to the engineers who did this work, or see the hybrid projects and solar farm projects.