When you are investing in a large-scale renewable energy project, you need a technical advisor who works solely for you. ElectraGlobe's owner's engineering service provides independent oversight across the full project lifecycle, from design review through to commercial operation.
We act as your technical representative on site and at the table, so risks are identified early, contractors deliver to specification, and your project reaches its performance targets.
Independent Oversight Across the Project Lifecycle
- Design review: contractor concept and detailed design assessed against your specification
- Procurement support: equipment specifications and datasheets reviewed before order
- Construction monitoring: hold points, quality audits and independent site inspections
- Commissioning: witness testing, performance verification and handover
What Is Owner's Engineering?
An Owner's Engineer (OE) is an independent technical representative appointed by the project owner or investor to review, monitor and verify the work of EPC contractors and other project participants. Unlike the contractor's engineer, the OE's sole obligation is to the owner.
For utility-scale solar and BESS projects, owner's engineering is increasingly required by lenders, investors and off-take agreement counterparties as a condition of financial close.
What ElectraGlobe Delivers
Our scope is set by the phase your project is in, and by how much of the technical oversight your internal team already covers.
| Pre-Construction | What we deliver |
|---|---|
| Design review | Independent review of contractor concept and detailed designs against your specification |
| Technical due diligence | Technical assessment supporting investment and financing decisions |
| Procurement support | Procurement specification review and equipment datasheet assessment |
| Grid connection | Connection agreement and GPS compliance review |
| Construction Phase | What we deliver |
|---|---|
| Quality assurance | Hold point inspections and construction quality audits |
| Site presence | On-site supervision and progress reporting |
| Non-conformances | Identification, tracking and close-out management |
| Interface management | Coordination between contractors, NSPs and the owner |
| Commissioning and Handover | What we deliver |
|---|---|
| Commissioning | Commissioning plan review and witness testing |
| Acceptance | Acceptance testing support and performance verification |
| Documentation | As-built documentation review |
| Handover | Handover report and outstanding works register |
Across all three phases we coordinate the technical interfaces on your behalf, and every inspection is carried out against the industry standards and project specifications your contract is written to.
Why Independent Oversight Matters
What Independent Assurance Protects
- Financial close: lender and investor requirement on major projects
- Early detection: design and construction defects found before they become defects in service
- Evidence: an independent record of construction quality for warranty claims
- Contractual compliance: contractor work verified against the technical specification
- Performance: reduced risk of a shortfall at commercial operation
Owner's Engineer for Solar, BESS and Hybrid Projects
Our owner's engineering work is focused on the asset types we design every day: utility-scale solar farms, grid-scale battery energy storage and co-located hybrid projects. That matters because an owner's engineer is only as useful as their ability to spot what the contractor's design has got wrong. Our reviews are done by engineers who produce IFC packages, grid connection studies and GPS submissions themselves, so they know where problems usually hide: string and cable sizing, protection settings, earthing, plant controller tuning and the commissioning sequence the DNSP or TNSP will expect.
Frequently Asked Questions
What does an owner's engineer do on a renewable energy project?
An owner's engineer represents the project owner or investor, not the contractor. They review the design, check equipment before it is ordered, inspect construction at agreed hold points, witness commissioning tests and confirm the plant meets its specification and performance guarantees before it is accepted.
When should an owner's engineer be appointed?
Ideally before the EPC contract is signed, so the technical specification and the tender designs are reviewed while changes are still cheap. Many owners and lenders also appoint one at financial close or at the start of construction.
Is an owner's engineer the same as a lender's technical adviser?
No. A lender's technical adviser reports to the financiers. An owner's engineer works for the owner day to day on site and in design reviews. On some projects the two roles work alongside each other.
Related Guides
- Owner's engineering in renewable energy: a complete guide
- Golden table review: the first quality hold point on solar PV construction
- Commissioning a 5 MW solar farm: from CMP to DNSP approval
- Why commissioning runs late: five causes
Who We Work With
We provide owner's engineering services to project developers, infrastructure funds, energy retailers and corporate energy buyers who need independent technical assurance on their renewable energy investments.
If you have a project already under an EPC contract, or one approaching financial close, we can tell you quickly where the technical risk sits and what level of oversight it warrants.