NSW New South Wales
–/MWh
The current 5-minute wholesale price for New South Wales ($/MWh), updated every 5 minutes from AEMO data.
–/MWh
Data: Australian Energy Market Operator (AEMO), NEMWeb dispatch reports, used under AEMO's Copyright Permissions. Processed by ElectraGlobe. Prices are 5-minute dispatch prices in NEM time and may be revised. Informational only. Not for trading or financial decisions.
Hover or tap the chart to read the price at that time.
New South Wales has the largest demand in the National Electricity Market, centred on Sydney, Newcastle and Wollongong. Its supply has long been anchored by large black coal stations, with hydro from the Snowy Scheme, gas peakers and a fast-growing fleet of solar, wind and batteries. Because demand is high and the coal fleet is ageing, New South Wales tends to have higher average prices and far fewer negative-price hours than South Australia, Victoria or Tasmania.
Price spikes in New South Wales usually come on hot afternoons and evenings, when air conditioning drives demand up and an unplanned outage at a large unit leaves the region short. On those days the price can reach the market price cap for several intervals.
New South Wales sits in the middle of the NEM. It imports from Queensland through QNI and Terranora, and trades with Victoria through the Victoria–New South Wales Interconnector. It is frequently a net importer, which means its price is often set by what neighbouring regions can send in.
The state's Electricity Infrastructure Roadmap is building renewable energy zones in Central-West Orana, New England, the South West, Hunter-Central Coast and Illawarra, each with new transmission and an access scheme that limits how much generation connects. For a developer, the zone, the access rights and the marginal loss factor at the connection point matter as much as the price on this page. See MLF and curtailment risk for why.
For how prices are set across all five regions, why they go negative, and how to read the figures, see the live NEM prices guide.